POS gets slower as more customers connect
Guest Wi‑Fi, POS, cameras and computers share the same router and fail together.
Business networks · Barcelona
We design the complete network: cabling, switching, Wi‑Fi, segmentation and documentation. No dependence on one router or undocumented configurations.
Initial guidance via WhatsApp. Scope and price are confirmed before work starts.
Warning signs
A fast ISP connection cannot compensate for an internal network without structure, capacity or ownership.
Guest Wi‑Fi, POS, cameras and computers share the same router and fail together.
Rooms and storage remain uncovered away from the router.
There is no reliable map between outlets, switches and devices.
The fault disappears briefly but the cause remains.
Adding an AP or camera can affect existing services.
Technical scope
Scope adapts to offices, hotels, restaurants, shops, clinics and industrial sites.
Plans, equipment, routes, racks and dependencies.
Gateway, switching, addressing, VLANs and policies.
AP position and capacity, channels, power and roaming.
Power, uplinks, ports and growth.
Separation of guests, staff, POS and cameras.
Configuration, testing, backups and documentation.
Verifiable design
We document architecture so future changes do not require rebuilding the project.
01
Internet and gateway
02
Business network and servers
03
Guest or customer Wi‑Fi
04
POS, voice and critical devices
05
Cameras and access control
06
Management, backups and monitoring
Conceptual diagram; final topology depends on the survey.
Process
We gather use, area, floors and problems.
We verify routes, racks, coverage and cabling.
Architecture, equipment, scope, price and exclusions.
Work is divided into agreed zones and windows.
We validate services, segmentation and coverage.
We hand over diagrams, inventory and recommendations.
Handover
Connected services
Yes. We retain useful equipment and replace only what limits stability or maintenance.
Usually not; work is phased into agreed zones and windows.
It is common, but design follows requirements and total cost.
It can be and is clearly separated in the proposal.
With the business type, area, floors and main problem we can recommend a sensible next step.