Structured cabling · Barcelona

Structured cabling installation for businesses

We install the physical foundation for desks, Wi‑Fi, POS, cameras, telephony and inter-floor links. Every line is identified, tested and documented.

Initial guidance via WhatsApp. Scope and price are confirmed before work starts.

Warning signs

Hidden cabling becomes visible when it fails

An orderly installation reduces diagnosis time and supports safe growth.

01

Unlabelled outlets

Outlet cannot be matched to patch panel.

02

Unsuitable cable

Category, length or route cannot support speed or PoE.

03

Overloaded rack

Crossed leads and no room to grow.

04

Customer Wi‑Fi ends up wherever the cable reaches, not where it is needed

Coverage in the dining room, terrace or rooms depends on where the cable was run, not where signal actually fails.

05

Weak backbone

Distance or missing fibre limits the network.

Technical scope

A physical layer ready to operate and grow

Materials and routes follow distance, environment, PoE and speed.

Workstations

Outlets for users, printers and voice.

Access points

Cabling and PoE to coverage positions.

CCTV and access

Lines for cameras and access devices.

Racks and panels

Organisation, spare capacity and power.

Backbone and fibre

Links between racks or floors.

Labelling and tests

End-to-end identification and checks.

Verifiable design

Every link has a known origin, destination and purpose

Cabling is business infrastructure, not independent wires.

01

Main rack and patch panel

02

Inter-floor backbone

03

User outlets

04

PoE for Wi‑Fi

05

PoE for CCTV

06

Labels, tests and plan

Cat6, Cat6A or fibre follows technical need.

Process

Plan first to prevent rework

  1. 01

    Requirements

    Count points, uses and distances.

  2. 02

    Set-out

    Agree positions and containment.

  3. 03

    Proposal

    Separate points, metres and special works.

  4. 04

    Installation

    Pull, terminate and protect routes.

  5. 05

    Testing

    Match outlets and panel ports.

  6. 06

    Handover

    Deliver point schedule and notes.

Handover

An installation another technician understands

  • ✓Point plan
  • ✓Outlet and panel codes
  • ✓Cable types
  • ✓Test results
  • ✓Rack photos
  • ✓Growth options

Frequently asked questions

Cat6 or Cat6A?

It depends on distance, speed and PoE.

Fibre between floors?

Yes where distance or capacity justifies it.

Do you certify lines?

Only when expressly contracted.

While business is open?

Often yes, in agreed phases.

Tell us what is happening on your network

With the business type, area, floors and main problem we can recommend a sensible next step.

Request a project review